At WJM, we have a professional and experienced engineering and R&D team dedicated to the development of silicone and plastic products. We not only manufacture products, but also provide a one-stop engineering solution from concept to mass production, helping our customers turn ideas into reliable, mass-producible products quickly and efficiently.


Project Kick-off Requirements

At the early stage of development, customers can provide either:

  • 3D drawings (STEP / STP / IGS format), or

  • Physical samples / reference samples

Our engineering team will evaluate the manufacturability (DFM) of the product and optimize the structure, materials, and production process to ensure stable and efficient mass production.


Standard Engineering Development Process & Lead Time

1. Mold Design Data Preparation (2–3 Days)

Based on the 3D drawings or samples provided by the customer, our engineering team will:

  • Analyze the product structure

  • Confirm parting lines, draft angles, wall thickness, and assembly details

  • Prepare complete mold design drawings and 3D data for tooling

After customer confirmation, the project will proceed to the next stage.


2. Prototype / Mock-up Sample (About 5 Days)

After the structure is confirmed:

  • We will produce a prototype using CNC machining or 3D printing (depending on product structure)

  • The prototype will be sent to the customer for:

    • Structure verification

    • Dimension check

    • Assembly and functional testing

This step helps minimize tooling risks before official mold making.


3. Tooling Development & T1 Samples (10–15 Days)

After the customer confirms the prototype structure:

  • We will start the official mold making process (silicone mold or plastic injection mold)

  • Conduct the first trial (T1) after tooling completion

  • Provide official functional / engineering samples

These samples are already close to or at mass production standard and can be used for:

  • Market testing

  • Customer approval

  • Pilot production

  • Certification testing


Our Engineering Advantages

  • Extensive experience in silicone and plastic product development

  • Familiar with multiple processes: LSR, solid silicone, overmolding, double-shot injection, precision injection, etc.

  • DFM concept implemented from the design stage

  • Fast prototyping and fast tooling mechanism

  • Integrated optimization of structure, tooling, and manufacturing process


Overall Project Lead Time (Reference)

Stage Lead Time
Mold design data preparation 2–3 days
Prototype sample ~5 days
Tooling & T1 samples 10–15 days
Total Approx. 17–23 days
 
Mold making and R&D 2Mold making and R&D
 
The actual lead time may vary depending on product structure complexity, size, and process requirements.
Related Products List
We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send